APARTMENT FOR PROFESSIONALS, CAINE ROAD
Brief:
Sustaina was appointed to take over a stalled apartment refurbishment after the original contractor abandoned the project mid-build. Our mandate was to stabilise the programme, safeguard quality, and deliver a resilient, low‑maintenance home suited to busy professionals
What we did:
When the contractor disappeared mid-build, we stepped in to stabilise and complete the project. We began with a comprehensive technical audit, uncovering faulty drainage, misrouted water feeds, and mis-wired electrics; each issue was rectified to establish a safe, fully compliant foundation. With the baseline secured, we delivered the refurbishment to a high standard—installing energy-saving double-glazed windows, bespoke kitchen cabinetry, a modern shower room, and a full-paint finish.
The result is a revitalised apartment designed for professional living..
TYPE:
SCOPE:
LOCATION:
SIZE:
STATUS:
TIMELINE:
RESIDENTIAL FIT-OUT
FULL SCOPE
MID LEVELS, HONG KONG
600 SQFT
COMPLETED 2025
5 WEEKS
As busy professionals with zero time to micromanage a renovation, we were blown away by how seamless they made the process. They handled everything with expertise, kept us informed without overwhelming us, and delivered exceptional quality we didn’t have to stress over. No chasing, no guesswork—just reliable, high-end results.
S. Corr, Senior Manager